PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing ductwork fittings at the 1st floor Facing North.jpg Started constructing the equipment rack for the Electrical panels Facing East.jpg Started installing temporary protection around the 1st floor Facing South.jpg Welding clips along Column H-1 Facing South.jpg Welding clips at the 4th floor Facing North-East.jpg Finished installing the beams at Elev. 4 and installed metal decking Facing South.jpg
Previous pageNext page Welding clips at the 4th floor Facing North-East
Welding clips at the 4th floor Facing North-East